Rating: 3.8/5 (6 votes)
Krung Thon Bridge
Operating day: Daily
Operating time: 24 Hour
Krung Thon Bridge construction began on August 31, 2497 by Fuji Carlos Manuel Phone Co., Ltd of Japan, a United Engineering Works Limited is the representative in Australia. The ground-breaking ceremony on June 24, 2498 consist of a steel bridge Bridge length 6 the foot of the bridge on both sides of the concrete. There are sidewalks on either side of the opening.
Through the middle of the bridge above the sea level of 7.50 meters, the bridge is not open. Completed and opened to traffic on March 7,2500 total construction budget amount of 24,837,500 baht.
This bridge was built to facilitate the transport of people on both sides of the river. And alleviate the congestion of the Memorial Bridge. Krung Thon Bridge was completed and opened to traffic on March 7, 2501 called Sanghi.
Category: Art, Culture and Heritage
Group: Landmarks and Memorials
Last Update : 5 MonthAgo